Suncor Energy T&D Integrated Reliability Project

- Review the existing power system design , identifying the weakness of the system and recommend solutions to improve the reliability

- Equipment Condition Evaluation, Risk Assessment, and Contingency Planning

- Develop optimized maintenance strategies based on RCM (Reliability Centered Maintenance) model for each substation and power line.

- Developed Maintenance procedure and check sheets as per the latest applicable standards

- Develop criticality ranking for the HV system - Develop spare part and stock strategy

- Develop Computerized Maintenance Management System (CMMS) for the power system

- Safety and Arc flash audit for the power system