Harmonic Analysis, Grounding Studies, Protection& Arc Flash analysis for compressor station
Harmonic Analysis, Grounding Studies, Protection& Arc Flash analysis for compressor station
Quebec, Canada
- Problem Definition:
As part of the expansion project, the client wanted to add a new compressor station beside the existing station. The new station required a new 25KV system to supply power to the large compressors. - EAMEC Scope:
- short circuit, coordination, Arc Flash and
- Protection matrix and logic diagram development
- Relay setting file development for SEL relays at 25KV
- Harmonics analysis for Les-Cedres compressor station
- Detailed grounding studies using CDEGS /SES software
- Proposed Solution:
- To work with the design group of ILF Engineering and use their inputs to complete the studies.
- Steps Taken:
- Engineering and vendor data collection, Hydro-Québec power systems data collection, developed P&C matrix, developed power systems studies followed by the protection relay setting file development, construction support.
- Outcomes and Benefits for the Client:
- A properly designed and studied system for their new operations.